The Miller oilfield is a deep reservoir under the , 240 kilometres north-east of in UKCS Blocks 16/7b and 16/8b. It was discovered in 1983 by BPMcClure, N.M., and Brown, A.A., Miller Field, 1992, in Giant Oil and Gas Fields of the Decade, 1978-1988, AAPG Memoir 54, Halbouty, M.T., editor, Tulsa: American Association of Petroleum Geologists, , pp. 307–322 in a water depth of 100 metres. Production from Miller field started in June 1992, and plateau production was from late 1992 to 1997 at rates of up to of oil and of gas per day at standard conditions. Miller produced some of oil during its lifetime. The field is named after who contributed to Scottish geology in the early nineteenth century.

The Miller field reached the end of its economic oil and gas producing life in 2007 when Cessation of Production (CoP) approval was received from the UK government. Preparations are currently under way to decommission the Miller platform, but the oil and gas pipelines will be preserved for future opportunities. BP North Sea Website : http://www.bpnsi.com/index.asp?id=7369643D312669643D313130

On 1 April 2009, sixteen people were killed in the crash of a helicopter carrying workers from the Miller field back to Aberdeen.


Geology
The reservoir consists of Upper , 2 km deep, in the South Viking . The Formation is the source rock.


Reservoir
The Miller reservoir is located at a depth of below sea level, it has an estimated area of and a maximum thickness of . Reservoir pressure is and reservoir temperature is 121 °C. The oil has a gravity of 39°API and a sulphur content of 0.40%.
(1994). 9780115153808, HMSO.

As of 1999, BP estimated the total recoverable reserves from the field to be of oil and of natural gas. Total oil in place for the reservoir is .


Development
The Miller platform was built by Highlands Fabricators in Nigg Bay, it was installed in July 1991. Its first year of peak production was 1993 when it produced 5.9 million tonnes per year.


Export pipelines
Gas export from Miller was via a sour gas pipeline system (Miller Gas System) comprising a 241 km, sealine to St Fergus and then on via a 17.5 km landline to Peterhead Power Station.

Miller oil was pumped via a 7.5 km-long, export pipeline to the Brae A platform and then onwards via the Forties pipeline system to the mainland.

In 2003, BP constructed a new 8.5 km, gas pipeline between the Brae B and Miller platforms to allow gas to be exported from Brae to Miller for use in the Miller Field EOR (Enhanced oil recovery) scheme.


Decommissioning
Formal cessation of production for the Miller field was approved by the DECC in September 2007. In 2009, BP estimated the gross cost of decommissioning the field to be of the order of £300 million.

The initial phase of decommissioning activities involving well abandonment and topsides cleanup were completed by the end of 2009. The oil and gas export pipelines have been flushed clear of hydrocarbons and are being left in place for potential future use. The Miller platform topside and jacket will remain in place for several years while detailed plans for their removal are developed. The Jigsaw search and rescue helicopter will remain on the Miller platform during this period with minimum staffing to continue to support search and rescue operations.


Carbon sequestration
BP developed plans to reuse the structure for deep carbon sequestration.Nicole Branan "More answers – and questions – about carbon storage" Geotimes February 2008 "BP And Partners Plan Clean Energy Plant in Scotland, Increasing Oil Recovery And Reducing Emissions" 20 June 2005 (press release)

Page 1 of 1
1
Page 1 of 1
1

Account

Social:
Pages:  ..   .. 
Items:  .. 

Navigation

General: Atom Feed Atom Feed  .. 
Help:  ..   .. 
Category:  ..   .. 
Media:  ..   .. 
Posts:  ..   ..   .. 

Statistics

Page:  .. 
Summary:  .. 
1 Tags
10/10 Page Rank
5 Page Refs